After the success of the first 6000 m3 TSHD Arzana, NMDC decided to have a second, slightly bigger hopper dredger built—a 8000 m3 hopper dredger, to be exact. The installation remained virtually the same, which was a great advantage for IHC and for us.

Shipyard Royal IHC Kinderdijk
Customer NMDC
ghasha-1-web-1
Van der Leun supplied the following features:
  • System integration
  • Main Switchboards
  • Distribution boards
  • Transformers
  • Nautical equipment
  • CCTV
  • Engineering and project management
  • Shore supply
  • Wheelhouse desk / ECR console
  • Navigation equipment
  • Internal communication
  • Cable Package
  • Emergency Stop system
  • Fire detection system
  • Announcement system
  • General alarm system
  • Public address system
  • Battery chargers incl. batteries and battery boxes
  • UPS
  • Commissioning
  • Installation

All equipment was produced in accordance with the rules and regulations of Bureau Veritas.