Platform supply vessel PSV (Pool Express and Vos Base)
Upgrade of dynamic positioning from DP1 to DP2. After the new construction in Romania, Van der Leun provided maintenance for both ships. Because of the increasingly high requirements in the offshore world, Vroon decided to upgrade both ships from DP1 to DP2. That way, both ships remain useful for a wide range of applications.
Shipyard | Damen Harlingen |
Customer | Vroon offshore |
Prior to the actual conversion, Van der Leun received a commission for the engineering of the conversion from DP1 to DP2. In collaboration with our Brazilian branch, the service department worked as a team to meet the challenge of converting the ship to a DP2 ship in two weeks under Class (Lloyds) to meet the FMEA trials.
Van der Leun supplied the following features:
- System integration
- Main Switchboards
- Distribution boards
- Alarm monitoring systems
- Power management System
- Engineering and project management
- Wheelhouse desk / ECR console
- Cable Package
- Emergency Stop system
- Kongsberg system
- Battery chargers incl. batteries and battery boxes
- UPS
- Commissioning
- Installation
All equipment was produced in accordance with the rules and regulations of Lloyds Register.
Projecten
Meer projectenRead more
Diesel Electric Hopper
Shipyard | Eastern Shipbuilding Group |
Customer | Royal IHC |
Read more